Experience
Last experiences:
- Engineering and installation of new oil reactor for food industrie
- Engineering and site supervision for chemical dosing systems
- Site suppervision for installation fo the new fire fighting system.
- Engineering of a new fire fighting system for oil storage terminal. System with a total flow capacity of 900 m³/h.
- Site supervision for installation sulphuric acid tank. Storage capacity of 650 m³.
- Engineering of fifi pump units.
- Site supervision for installation of waste water plant. Storage tank and first waste water purification system.
- Site supervision by installation of a cooling water line with a total capacity of 1300 m³/h.